Thursday, December 9, 2010
Toilet installed..
We were up at 8am this morning. Dawn came by for a visit and to pick up the pictures of Rylee. After she left we had breakfast and showers. I took Beth to pick up the Jeep and I went to the bank. Beth stopped at Lowe's to pick up the door hinges and a couple of other things. Today was the day to get the toilet installed downstairs. So off we went. We had problems with one of the bolts not fitting, so we went to plan B and added a spacer and used a different screw. Beth could hardly wait to turn on the water. So slowly the water was turned on and no leaks. We did the flush test and no water. So Beth is a happy camper that the toilet is now working. We decided that we could only get a 20 inch vanity and the choices were very limited. So off to Lowe's we went to get the vanity and a water supply line. We carried the vanity downstairs and set it in the space and boy does it look good in there. We want to install the mirror first, but need to shut the electric off first. We will then install the light and new switch. We then left and went to Bed Bath and Beyond to get the towel bar and toilet paper holder as I had coupons. We came home and I fixed steak for dinner. We then went back downstairs and Beth worked on the toilet paper holder and I finished wrapping presents. We have so many things to still do in the next 11 days. I am starting my baking tomorrow, so I can get the rest of the packages mailed.
Subscribe to:
Post Comments (Atom)
1 comment:
Blogs need "LIKE" buttons =)
Post a Comment