Sunday, April 19, 2015

Daywall

We slept until 8:30am this morning. We took showers and had breakfast. We headed out to pick up Dawn and Rylee, then went to Lowe's to get the stuff we needed to fix Joan's hole in her drywall where she had a crack in the foundations. It was a strip around 14 inches wide and 80 inches long with another right beside it about 13 inches wide by 10 inches long. We decided it would be best to knock the hole a square 31 1/2 by 80 so the drywall would fit better. It took a couple hours to get that to happen. I cut the drywall and we fitted it with some trimming. Dawn and Beth did most of the work, I keep Rylee out of the way. We took a break around 2pm and had lunch, then finished up the first coat of mud and left around 4:30pm. We will go back tomorrow for a sand down and another set of mud. Hopefully it will be done by Wednesday.

No comments: